<\/a>The project 3 years after construction.<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"
Frogs Leap Winery Riverbank Stabilization and Revegetation Project Napa River Saint Helena, California Constructed in 1997, this project is located along the Napa River on the Frogs Leap Winery Galleron Vineyard.\u00a0 A 25 foot tall eroding streambank was threatening a vineyard road.\u00a0 The erosion was caused by a mid-channel gravel bar which was pushing the channel into the bank.\u00a0 The Continue Reading<\/a><\/p>\n","protected":false},"author":2,"featured_media":4109,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-fullwidth.php","meta":[],"_links":{"self":[{"href":"https:\/\/bioengineers.com\/wp-json\/wp\/v2\/pages\/4119"}],"collection":[{"href":"https:\/\/bioengineers.com\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/bioengineers.com\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/bioengineers.com\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/bioengineers.com\/wp-json\/wp\/v2\/comments?post=4119"}],"version-history":[{"count":11,"href":"https:\/\/bioengineers.com\/wp-json\/wp\/v2\/pages\/4119\/revisions"}],"predecessor-version":[{"id":4149,"href":"https:\/\/bioengineers.com\/wp-json\/wp\/v2\/pages\/4119\/revisions\/4149"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bioengineers.com\/wp-json\/wp\/v2\/media\/4109"}],"wp:attachment":[{"href":"https:\/\/bioengineers.com\/wp-json\/wp\/v2\/media?parent=4119"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}