<\/a>The project two years after construction.<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"
\u00a0Russian River Riverbank and Riparian Revegetation Project Rochioli Vineyards Healdsburg, California This project was constructed at the Rochioli Vineyards along the Russian River near Healdsburg, California.\u00a0 The project stabilized and revegetated 705 feet of eroding riverbank that was threatening a vineyard and vineyard access road.\u00a0 The following bioengineering techniques were used to stabilize the riverbank: live willow siltation baffles, boulder Continue Reading<\/a><\/p>\n","protected":false},"author":2,"featured_media":2504,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-fullwidth.php","meta":{"footnotes":""},"_links":{"self":[{"href":"https:\/\/bioengineers.com\/wp-json\/wp\/v2\/pages\/2829"}],"collection":[{"href":"https:\/\/bioengineers.com\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/bioengineers.com\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/bioengineers.com\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/bioengineers.com\/wp-json\/wp\/v2\/comments?post=2829"}],"version-history":[{"count":39,"href":"https:\/\/bioengineers.com\/wp-json\/wp\/v2\/pages\/2829\/revisions"}],"predecessor-version":[{"id":4178,"href":"https:\/\/bioengineers.com\/wp-json\/wp\/v2\/pages\/2829\/revisions\/4178"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bioengineers.com\/wp-json\/wp\/v2\/media\/2504"}],"wp:attachment":[{"href":"https:\/\/bioengineers.com\/wp-json\/wp\/v2\/media?parent=2829"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}