The Asti Winery Riverbank Stabilization and Fish Habitat Enhancement Project was constructed in the summer of 2011.\u00a0 The project was divided up into three eroding sites along almost a mile of river front owned by the Asti Winery.\u00a0 One of the techniques used in the project was a series of vegetated boulder wing deflectors constructed at site 2.\u00a0 Below are a series of photographs showing site 2 before, during and after construction of the vegetated boulder wing deflectors.<\/p>\n
Below the project pictures are some underwater footage of steelhead fry swimming among the willow branches of the vegetated boulder wing deflector.<\/p>\n